Enterprise Project Manager
Build 173 Service Pack 3

NOTE: **This service pack is cumulative and will contain previous patches created
for EPM36b173.


_____________________________________________________________________________________________

*** The following fixes are included in the EPM36b173SP3ga.zip service pack:

1) Histogram failed to show data properly when using the 3D option under Windows NT.
2) Pending time displayed data incorrectly under Windows NT.
3) PR-6 report would show dates off by a year.
4) Fixed file reorganize to remove corrupt accounting periods.
5) Added to file reorganize to correct finish dates less than start dates when using
Update Status (all finish dates less than start dates will be set to the start date).
6) Fixed Update Status to not allow finish dates less than start dates (all finish dates
less than start dates will be set to the start date).
7) Start dates on CPM failed to show after Y2K.
8) Fixed variable fields not accepting values after changing the field type from/to date.
9) AC-7 report failed to show projects with a group code containing more than one user when
viewing Period Actuals by Project.
10) WK-7 report failed to show projects with a group code containing more than one user when
viewing Period Actuals by Project.
11) Some users would get a GPF error when trying to run reports. Added an update to file
reorganize to fix this problem. Do a full file reorganize.
12) AC-3 report was showing numeric values for the manager name and some invalid numeric
totals.
13) Setting summarize actuals to "yes" would cause invalid totals in projects containing
compressed tasks.
14) MR-2 report not showing data after Y2K.


_____________________________________________________________________________________________

*** The following fixes are included from the EPM36b173SP2ga.zip service pack:


1) Under Help->Choices->Management periods->Zoom caused an "Invalid file Version"
message and EPM to improperly shut down.
2) MR-3 report failed to show data that existed after Y2K.
3) Time file consolidation routine clipped time file notes to only show 5 lines
of the notes and corrupted the block_number field in ODBC view.
4) Inserting unscheduled events into the time file may cause loss of actuals once
time file has been closed then reopened.
5) Time file and project notes sometimes would get duplicate lines and special characters.
6) MPX export was not correctly exporting date format specifications.
7) Last Posted date would sometimes get lost.
8) Split week post would fail to post any hours when time file contained days that have already
been posted.
9) Multi-scheduler included resource calendar events that were not in the scope of the project
schedule.
10) Error 2200 occurred when trying to file reorganize and backup.
11) When selecting resource via value sets EPM may not choose any resources.
12) Error 4600 occurred when trying to run the WK-2 report.
13) When using user defined fields, the description field did not truly display the variable
description.
14) The FC-2 report did not show the proper month/year.


_____________________________________________________________________________________________

*** The following fixes are included from EPM36b173SP1ga.zip service pack:


1) AC-2 report failed when running the report for periods after 9912.
2) MR-8 report failed when running the report for periods after 9912.
3) WK-3 report contained incorrect calculations for available hours when ran across Y2K.
4) Dates in Cost Accounting table in the ODBC catalog reflected 1900 instead of 2000.
5) Queries on Cost Accounting table in the ODBC catalog failed in the month of February.
6) The Weekly Notes table in the ODBC catalog was missing the Block_Number field.


_____________________________________________________________________________________________

*** The following fixes are included from EPM173p.zip patch:

1) First bar of the histogram usually showed zero availability.
2) MSP 98 MPX import has bugs; the patch includes a new mmiimpx1.cob.
3) Timesheet Refresh could loop when populated non-project events were found.
4) Project detail variable field contents 3, 4 and 5 could be lost when doing a RCVR2.


_____________________________________________________________________________________________

*** Instructions for this service pack:

1) Unzip the EPM36b173SP3ga.zip file into a temporary directory.
2) Copy all *.COB, *.DLL, *.EXE files into the MMIIPGMS directory.
3) Copy EPMrl36c.rct into the MMIIDATA directory.

**Note: EPM version will now show EPM 3.6 b174.

**Note: You must edit the ODBC DSN to point to the new catalog. For more information
on setting up your DSN, please view the ODBC_253 MS Word document included
in this service pack.

Download EPM36b173sp3ga.zip

Chat with CA

Just give us some brief information and we'll connect you to the right CA Expert.

Our hours of availability are 8AM - 5PM CST.

All Fields Required

connecting

We're matching your request.

Unfortunately, we can't connect you to an agent. If you are not automatically redirected please click here.

  • {{message.agentProfile.name}} will be helping you today.

    View Profile


  • Transfered to {{message.agentProfile.name}}

    {{message.agentProfile.name}} joined the conversation

    {{message.agentProfile.name}} left the conversation

  • Your chat with {{$storage.chatSession.messages[$index - 1].agentProfile.name}} has ended.
    Thank you for your interest in CA.


    How Did We Do?
    Let us know how we did so that we can maintain a quality experience.

    Take Our Survey >

    Rate Your Chat Experience.

    {{chat.statusMsg}}

agent is typing